A quiet earthen trail curves through winter hardwood forest, with mossy rocks and evergreen shrubs beside the path.

A Winter Guide to Paris Mountain State Park's Growing Northeast Side

About 0.9 mile up Brissy Ridge from the Buckhorn Gate parking area at Paris Mountain State Park, the Pipsissewa Trail branches off on a strenuous one-mile out-and-back to North Lake. That trail now has a namesake on the park's map. Pipsissewa Passage, named for "the popular trail that loops around North Lake," is a 65-acre property with mature forest and a two-acre pond ringed by granite walls. The Greenville County Historic and Natural Resources Trust says the property will let the state "open a new side of the park to the public."

That new side sits on the park's northeast edge along State Park Road. Over the past two years, the land deals and trail contracts at Paris Mountain have mostly been in that direction. For anyone in Taylors who treats Paris Mountain as the home mountain, this winter is a good time to learn the trails the park is growing around.

The land coming into the park

The Greenville Journal reported that the money for Pipsissewa Passage was finalized in December 2024. The county trust approved $500,000 on Dec. 16, and the South Carolina Conservation Bank approved $2.4 million two days later. The property is made up of two parcels, one of 56.4 acres and one of 9 acres, both bordering the northeast edge of the park. The larger parcel fronts State Park Road. The county trust lists the total project value at $2.9 million, with Naturaland Trust as the applicant.

To put that in scale, when the park reopened after Helene in October 2024, the Greenville News described it as a 1,700-acre park. The Journal said the Pipsissewa purchase would take it to almost 1,900 acres, and that visits had more than quadrupled between the pandemic and that January 2025 report.

The plan calls for a new entrance off State Park Road and a connector trail that links the property into the existing trail network.

More land is lined up behind it. In a state filing covering November and December 2025, the Department of Parks, Recreation and Tourism proposed buying four more parcels, about 23 acres of rolling hardwood and riparian forest. The parcels sit directly against the northeastern boundary and the "current Pipsissewa Passage / Wingard acquisition." The filing gives the reason for the purchase as the land's location, "ideal for expanding the park's existing trail system." Separately, the Conservation Bank's FY 2026 report lists Naturaland Trust's 88-acre Altamont Pass project. The report calls it the largest remaining unprotected parcel next to the park and says it protects a ridgeline, wildlife corridors and "heavily used public recreation space."

The trail work out for bid

Another tract adds new mileage inside the system you already know. The Hughes Tract is an undeveloped property of about 150 acres that Naturaland Trust offered to the state. A 2023 state project summary noted it had a flat area suited to future parking and trail access.

On Jan. 7, 2026, the parks department asked for bids on a "Hughes Tract Trail Build." The bid documents call for about 3.5 miles of new multi-use hiking and biking trail running from the Sulphur Springs parking area to its junction with the Firetower Trail. They also call for a 0.75-mile hiking-only section connecting the new trail to the existing Sulphur Springs Trail. The state posted its intent to award the contract to Southern Taproot LLC on Feb. 25. On June 22, 2026, the state's chief procurement officer denied a protest of that intended award.

The specs show what kind of climb the new trail will be. The existing Fire Tower Trail is a "steep, easy-to-follow, mostly-straight, old roadbed" that climbs 400 feet in 0.4 mile. That works out to an average grade of roughly 19 percent. The bid specs for the Hughes Tract trails call for full bench construction, average grades of 10 percent or less, and frequent drainage. As designed, the new route to the same junction is longer, much gentler and open to bikes.

The trails to learn before the new pieces arrive

Four existing trails frame the park's planned growth. One gave Pipsissewa Passage its name, two are the endpoints and tie-in for the Hughes Tract work, and one is the park's easiest loop. This winter, with the leaves down, the ridgelines and ravines on these routes are easy to read.

Pipsissewa and North Lake. Park at Buckhorn Gate and walk about 0.9 mile on Brissy Ridge to the Pipsissewa junction. From there the strenuous 1.0-mile Pipsissewa Trail runs out and back to North Lake. You can circle the lake on the 1.2-mile North Lake loop and come back on Kanuga or the way you came. Pipsissewa Passage takes its name from this trail.

Sulphur Springs. This 3.8-mile loop is white-blazed, narrow, rocky and steep, and it takes about two and a half hours. It runs along a ridge, passes the Old Firetower Trail, drops through ravines lined with mountain laurel and rhododendron, and levels out at Mountain Lake by the dam. The Hughes Tract's hiking-only connector will tie into this trail, and its new multi-use trail will start at the Sulphur Springs parking area.

Fire Tower. This is the 0.4-mile old roadbed, with views of the surrounding mountains from the top. Bikers have to come back down the way they went up. As of this month, the park's trail page lists every trail as open except the Fire Tower Little Spur.

Lake Placid. For a short outing, this 0.75-mile loop starts at the picnic shelter, follows the shoreline, drops below the dam, crosses a boardwalk footbridge and passes the swimming area.

The weekly rules for winter

On the official trail list, Sulphur Springs and Lake Placid are hiking-only, and most of the other trails are shared with mountain bikes. The park FAQ counts 15 miles of shared-use trail and sets two rules that shape the week. Mountain biking is allowed every day except Saturday, and in winter the park stays open on Tuesday evenings "for those who like to mountain bike in the dark."

So on Saturdays the shared trails have no bikes on them, and riders have a night window on Tuesdays. The Park Center also has a contour model of the park with the trail system laid out, and staff there can suggest a route.

Listed hours are 8 a.m. to 6 p.m. daily. Admission is $6 for adults, $3.75 for South Carolina seniors 65 and older, $3.50 for children ages 6 to 15, and free for children 5 and younger, according to the park's page this November.

The rebuilt stage, and who paid for it

Paris Mountain is growing after a hard stretch. After Tropical Storm Helene, the park manager described it as closed for about a month. It reopened in late October 2024, and at first every open trail was hiking-only. In his column that October, the state parks director wrote about crews cutting and chipping the storm-damaged Southern red oaks in the picnic flats. The tree rings, he wrote, told "a story that is over 150 years old."

The amphitheater stage was a loss too, and the way it came back shows who looks after this park. The Greenville News reported in September that the rebuild began in November 2025 and cost $25,000 to $27,000, mostly paid for by the Friends of Paris Mountain State Park. Part of the money came from people who bought the stage's cedar shakes at $50 apiece. Ranger Shawn Llewellyn told the paper that the shakes had raised close to $12,000. He worked with soil engineers so that if another storm like Helene came through, "it would still be there." Music in the Woods came back to that stage this fall for its 19th year, after a two-year break. Llewellyn told the paper the stage will also be used for plays in the future.

The same Friends group runs a Trail Steward program. Stewards give 4 to 5 days a year, usually on weekends, greeting visitors and helping park staff with light duties.

Winter dates on the park calendar

The park's program calendar has two more stops before the year turns over. Feed the Birds, a pine-cone bird feeder craft, runs Dec. 11 from 1 to 2:30 p.m. Stump the Ranger is Dec. 16 from 2:30 to 3 p.m.

New Year's Day has two events. The Paris Plunge starts at 10 a.m. at Lake Placid as a fundraiser for the Friends of Paris Mountain. Plunging costs $20 online or $25 on the day, and hot drinks and a sweet treat are waiting afterward. The park suggests bringing towels, warm dry clothes and a thermos. At noon, the First Day Hike meets by the stairs at the Park Center for a 0.75-mile winter walk around Lake Placid. Hikers who finish can pick up a First Day Hike sticker back at the Park Center.

Paris Mountain is one of the places that makes daily life around Taylors what it is, and the land being added on its northeast edge is part of that. If you're thinking about how the park and the streets around State Park Road fit into your next move, Ashley Swann is glad to walk through it with you. Let's Connect.

Work With Ashley

Follow Me on Instagram